I decided to post a list of my WIPS and FOs and stuff so I can keep track of them easier for the Naked Stix KAL. I’m down to 10 (possibly 9) projects to work on now.
I originally started with 17 projects, but I ended up starting 2 new ones… so 19 projects total.
+ Drop Stitch Scarf FINISHED!
+ Irish Hiking Scarf FROGGED! (Pattern is too boring [I've already knit 2 of them]/taking too long. Replaced with the HAT)
+ Irish Hiking HAT (Replacement for IHS) FINISHED!
+ Joe’s Present – 33%
+ Mistake Rib Scarf FINISHED!
+ Wavy Gravy FINISHED!
+ Dayflower Scarf FINISHED!
+ Booga Bag #1 FINISHED!
+ Booga Bag #2 FINISHED!
+ Diamond Fantasy Shawl FINISHED
+ November Mid-Month Dishcloth FINISHED!
+ Madison Scarf FINISHED!
+ Felted Clogs – 95%
+ Jaywalkers – 55%
+ To Bobble or Not To Bobble – 2 half-sleeves to go!.
+ Maze Jumper – not that far into it. need to work on it.
+ Baby Blanket FROGGED
+ Charlotte’s Web FROGGED! I can’t remember where I am in the pattern, and I’m not that far into it, so I’ve decided to restart it later.
+ Twisted Rib Socks FROGGED! I don’t like this pattern anymore. It knits up too slow, and I’m tired of it.
There you have it. Will post pics later, since I didn’t get time to last night.



*sigh* I am in awe of your knitasity. I need to take a picture of the hook on which I hang all my full project bags. It’s overloaded, and probably half the stuff on it has long been forgotten. I’d join the Naked Stix KAL if I thought there was even the remotest chance of me succeeding.
(Psst.. it says “JayWalkter KAL” in the side column!)
Wow, you’re really moving along.